|
Jan '07 - Manlift Hire are pleased to announce the arrival of our 13 meter Underbridge inspection unit which is mounted on a 18,000 k.g. G.V.W. Mercedes chassis. The machine has been operating on the M50 toll bridge in Dublin since arriving. It is also doing contract work in the U.K. |